Sim time08:00:00
Speed60×
Shift A · Day 1

Process Analytics

SPC · Cpk · drift · sensitivity · energy · root-cause priors
M28M37M42M43M44M45M51M53M54
OEE
2.0e-3
76.2%
FPY
2.6e-3
97.3%
P_max avg
4.6e-1
591.8 W
η avg
2.3e-4
24.21%
Throughput
4.8e-3
14 mod/h
Energy / module
3.8e-1
21.1 kWh
$ / W
2.0e-4
$0.107

OEE composition (waterfall)

Ideal100%−Availability−4.0%−Performance−5.8%−Quality−3.8%OEE86.9%
A·P·Q decomposition averaged over 13 stations · M37 observer

Power binning mix (last 200 modules)

Bin A ≥450W128 (100.0%)
Bin B 440–450W0 (0.0%)
Bin C 430–440W0 (0.0%)
Reject <430W0 (0.0%)
Realized revenue / module ≈$57.85