Sim time08:00:00
Speed60×
Shift A · Day 1

Day in the Life

Scripted 90-second scenario · TCO drift, thin-wafer batch, recovery

Scripted scenario

t = 0.0s / 105s · sim ×60

Beat timeline

Shift start — nominalt+0s
Latent drift in TCO sputtert+8s
Thin-wafer batch arrivest+22s
Engineer correction — stringer tensiont+38s
TCO target swapt+55s
Recovery — back in bandt+75s

Now playing

Press Start to begin the scripted scenario. Open the Ved panel on the right and Process Analytics in another tab to follow the drift commentary.

Demo coverage

  • Latent drift surfaced before SCADA alarm
  • Material excursion (thin wafer) → microcracks
  • Operator lever applied with audit trail
  • Maintenance event (target swap)
  • Recovery and KPI return-to-band