Day in the Life
Scripted 90-second scenario · TCO drift, thin-wafer batch, recovery
Scripted scenario
t = 0.0s / 105s · sim ×60
Beat timeline
Shift start — nominalt+0s
Latent drift in TCO sputtert+8s
Thin-wafer batch arrivest+22s
Engineer correction — stringer tensiont+38s
TCO target swapt+55s
Recovery — back in bandt+75s
Now playing
Press Start to begin the scripted scenario. Open the Ved panel on the right and Process Analytics in another tab to follow the drift commentary.
Demo coverage
- Latent drift surfaced before SCADA alarm
- Material excursion (thin wafer) → microcracks
- Operator lever applied with audit trail
- Maintenance event (target swap)
- Recovery and KPI return-to-band