Sim time08:00:00
Speed60×
Shift A · Day 1

TCO Sputter (PVD)

Station #5 · cell side · ×4 parallel · 180s cycle
running
Availability
97.4%
Performance
95.5%
Quality
98.6%
WIP
0
874 processed · 27 rejected

TCO Sputter — optical / electrical

Transmission spectrum (400–1100 nm)
Tnm
⟨T⟩ = 89.8% · Jsc_mul 0.987
Sheet R vs O₂/(Ar+O₂) %
Ω/sqO₂%
R□ front 66.1 Ω/sq · back 35.7 Ω/sq
Target life & poisoning
Target life remaining47.00%
Poisoning offset0.18
Contact ρ 4.07 mΩ·cm² · n_e 4.0e20
TCO is a four-way optical/electrical/contact/optical-stack trade-off. O₂ sweet-spot ~2%. Poisoning offset > 0.3 → schedule target replacement.

Hero physics — live levers

Adjustments mutate the active recipe and propagate through the physics chain on the next tick. Changes are logged in the lever tracker.
Sputter power6.00 kW
range 210
O₂/(Ar+O₂)2.00 %
range 0.55
Pressure5.00 mTorr
range 110
Scan speed12.00 mm/s
range 525
Substrate T150 °C
range 20200

Recent events

Lever-tracker filtered to this station:
tParamOld → New
413.5o2Ratio21.95
376.1sputterKw65.8